Main Roads Minister Craig Wallace inspects Alexandra Drive at the entrance to Warwick, which has been the scene of numerous patch-up jobs following recent rain. The Minister called on the Federal Government to provide more funds for a more permanent solution.
Main Roads Minister Craig Wallace inspects Alexandra Drive at the entrance to Warwick, which has been the scene of numerous patch-up jobs following recent rain. The Minister called on the Federal Government to provide more funds for a more permanent solution.

Money for region's roads pledged

DURING his three-hour visit Mr Wallace attempted to guide the Daily News through the myriad of road funding programs operated by both Federal and State governments, but was at pains to sheet responsibility for highways home to Canberra.

“I know how much people hate politicians blame-shifting but the reality is these are their roads,” Mr Wallace said.

“With the Gap, we have put in a $30 million proposal to Canberra for safety work to clean up the upper ledges and remove boulders, but we have nothing yet in return.

“Likewise we have estimated around $40 million is needed to widen and improve the New England Highway between Warwick and Stanthorpe, which is less than eight metres wide in places and doesn't have proper road shoulders.

“I just hope that with the independents we now have down there with a regional focus that they will make the need for a road spend here well and truly known.”

Mr Wallace said as Main Roads Minister he was responsible for 33,500 kilometres of roads in Queensland with $792 spent on them for every Queenslander every year out of state coffers.

“In Western Australia it's $232 per person per year and $202 in Victoria,” he said.

Driving through the Eight Mile, Main Roads regional director Tony Platz said they had not received any reports of incidents since they widened and moved the turning lane from Warwick to Toowoomba further back.

The Daily News then pointed out the problem of Alexandra Drive, which has recently been the subject of repeated patch-up works and a road which a number of residents have complained about.

Mr Wallace said he would prefer the road fully resealed rather than patched, but as it was a federal-funded road he was unsure of the funding allocation.

Mr Platz advised the turning lane travelling from Warwick into Yangan Road was too narrow and a particular concern during peak school times and the Minister agreed this would be looked into.

The next stop on our tour was to visit a concerned couple who phoned the Daily News on Monday wanting better signage and visibility turning off the New England Highway into Ford Road.

Cathy and Richard Oehlmann's case became perfectly clear when the Main Roads' V6 Honda Accord drove straight past their unsigned turn-off and had to perform a U-turn – when safe – to stop and hear their plight.

Mrs Oehlmann informed Mr Wallace their road was popular with car enthusiasts and every time a new sign is put up on the highway it was only a matter of time before a Ford fan pinched it for their pool room.

“The highway isn't wide enough as well, just the other day I was waiting to turn into the road and a road train was coming up behind me at an alarming speed with no room to go around me,” she said.

“Another time we had a fellow fall asleep and end up in our paddock.

“We've already had two fatalities in our family and we don't want to be responsible for anyone losing their life turning in to visit us.”

Mr Wallace promised there and then to fix the dangerous highway situation.

“We'll give the trees a really good trim, as well as getting some new signage up straight away – hopefully it will all be done by Christmas,” he said.

Other worries put to Minister Wallace during yesterday's tour included:

The helipad at Cunningham's Gap

“That is a Queensland Health facility and one problem they have up there is there is no mains electricity supply,” Mr Wallace said.

“Solar is an option but you'd need a big battery supply. I'll take that bid to Queensland Health as it is a vital facility should there be a serious accident in that part of the region.”

Closed shoulders at Warrill View

Mr Wallace said they have put in a request for Federal funding as it's part of the national road network, believed to be around $5 million to fix the embankment.

Between The Gap and Aratula

“It's very rough there, we stopped and had a look on our way here and we'd like to see the Federal Government put in some money rather than patching and resealing to replace the whole lot,” Mr Wallace said.

Heavy vehicle bypass

The Minister and Mr Platz confirmed they will begin a study into a bypass for Warwick using traffic data collected last year to determine if a bypass is needed.

“Businesses would be quite nervous about a bypass as they see it as a reduction in business but where we've seen bypasses in the past they've worked OK and they haven't seen a decline,” Mr Wallace said.

“A bypass has been on the agenda (for Warwick) for many years, since about the 1990s at least and we'll need to determine a range of things including if there is a bypass, should it just be for heavy vehicles?”

“The study should be finished by June next year and include community consultation,” Mr Platz added.

Main Roads is expected to release more details about the bypass study this week.


Brisbane preferred candidate to host 2032 Olympics

Premium Content Brisbane preferred candidate to host 2032 Olympics

Olympics 2032: Brisbane gets IOC green light to go for Olympic gold

Qld’s $8.9b drug habit skyrockets

Premium Content Qld’s $8.9b drug habit skyrockets

Drug use in Queensland: Cocaine and ecstasy use surges

Defendant explodes in violent rage over court verdict

Premium Content Defendant explodes in violent rage over court verdict

Not even handcuffs could contain the frenzied outburst